The Ohio Department of Transportation (ODOT) reports the following construction projects that are anticipated to affect I-75 in Montgomery County next week. All outlined work is weather permitting.
- Interstate 75 Drainage Operation ā Expect 24-hour right shoulder closure and nightly lane closures on I-75, in each direction between Edwin C. Moses Boulevard and E. Central Avenue/S. Dixie Dr. on Tuesday, September 6 through Saturday, November 26, from 7:00 p.m. ā 7:00 a.m. Crews will be performing a drainage operation. Traffic will be maintained.
- Interstate 75 Drainage Operation – Expect nightly ramp closures from the Dryden Road to I-75 northbound, on Wednesday, November 16 through Wednesday, November 23, from 10:00 p.m. ā 6:00 a.m. Crews will be performing drainage operation and temporary asphalt work. The detour will be posted.
- Edwin C. Moses Concrete Operation ā Expect right lane closures on Edwin C. Moses Boulevard between Arena Park Drive and Cincinnati Street, on Tuesday, November 8 through Tuesday, November 22, from 7:00 a.m. ā 4:00 p.m. Crews will be working on the concrete island in the area. Traffic will be maintained.
- Interstate 75 Bridge Repairs ā I-75 southbound and northbound will experience nightly lane width restrictions and multiple lane closures, between Albany Street and S.R. 741, through Saturday, November 19.
The I-75 Exit Guide is the Internet’s largest and most complete website dedicated to Interstate 75 travelers. Find detailed exit service listingsā¦ lodging, camping, food, gas and more for every exit from Michigan to Florida!
On the road? Why not take us with you. The I-75 Exit Guide is mobile-friendly and totally FREE. No App Required.
Traveling another route? Visit our growing family of exit guides:Ā Ā I-4 Exit Guide,Ā I-5 Exit Guide,Ā I-10 Exit Guide,Ā I-75 Exit Guide,Ā I-80 Exit Guide andĀ I-95 Exit Guide.Ā Detailed exit service listingsā¦ discount lodging, camping, food, gas and more for every exit along the way!