Traffic Pacing on I-75 in Wesley Chapel November 29

1286
I-75 Traffic | I-75 Construction | Tampa Florida Road Construction | I-75 Exit Guide

The Florida Department of Transportation reports that traffic will be paced slowly (about 15 MPH) by law enforcement officers one or more times for up to 20 minutes in each direction of I-75 between 9:00 p.m. Monday, November 29 and 5:00 a.m. Tuesday, November 30. 

Northbound traffic control will begin at SR 56 (Exit 275) and southbound pacing will begin north of SR 52 (Exit 285). Lane closures will also be in place in the Overpass Road area (about halfway between Exits 279 and 285).

Traffic entering the interstate from interchange ramps within the pacing zone and the northbound I-75 rest area will not be able to enter until the front of the pacing operation has passed and law enforcement reopens the ramps. Motorists should allow up to 20 extra minutes for their drive time through the area. The traffic pacing is needed for concrete deck pours for a new Overpass Road bridge over I-75.


For more I-75 information, visit www.i75exitguide.com, the Internetā€™s largest and most complete website devoted to Americaā€™s Interstate 75. Detailed exit service listingsā€¦ discount lodging, camping, food, gas and more for every exit from Michigan to Florida!

Traveling another route? Visit our growing family of exit guides: I-4 Exit GuideI-5 Exit GuideI-10 Exit Guide and I-95 Exit Guide.

Previous articleFlorida DOT Eases Holiday Stress on Popular I-75 Shopping Destination Exit
Next articleRamp Closure, Detour for I-75 Work in Ohio Beginning December 1
I-75 Exit Guide
One of the most complete road travel resources of its kind on the Internet! The Interstate 75 Exit Information Guide features exit service listings for the entire length of I-75 from Michigan to Florida! Food, gas, lodging, rest areas, attractions and moreā€¦